SLOPE CHECK GUIDE FOR HOUSTON PROJECTSKey Measurements for Accurate Slope VerificationCritical Slope Parameters:2% Grade translates to 0.24" drop per foot3-Foot Level Check: target gap is 0.72" (≈11/16")Total Drop for standard length: 6.3" (6¼")Required Depth of compacted stone layer: 6"Field Verification Process:Place 3-foot level on base surfaceCenter bubble on levelMeasure gap under levelCompare measurement to 0.72" targetPractical Application Tips:Always perform checks in multiple locationsVerify measurements post-compactionDocument all readings for referenceHow to Use This Guide:Print this guide for quick field referenceAttach to your level for constant accessUse measurements to ensure proper drainageApply checks throughout construction processImportant Notes:This guide is designed for 2% slope standardMeasurements are in imperial units (feet/inches)Depths and drops are based on compacted stoneChecks should be performed before final compactionRecommended Usage:Tape this guide to your levelKeep a copy in your toolboxShare with construction team for consistent checks